News

  1. Home
  2. how to calculate amount of concrete sand and gravel for a yard using m10

how to calculate amount of concrete sand and gravel for a yard using m10

= (1/5.5)* Concrete Volume = (1/5.5)*2 = 0.3636 m 3. Density of Cement = 1440 kg/ m 3 = 0.3636 X 1440 = 523 kg = 10.5 Approx. Bags . Sand Quantity = ( Sand Part / Concrete Parts ) * Concrete Volume = (1.5/5.5) * 2 = 0.5454 m 3

Whatever your requirements, you 'll find the perfect service-oriented solution to match your specific needs with our help.We are here for your questions anytime 24/7, welcome your consultation.

Chat Online
  • sand calculator [how much sand do i need?] - construction

    sand calculator [how much sand do i need?] - construction

    Let’s say I have an area of 100 ft² that I want to cover with sand to a depth of 3 inches. The sand’s density is 100 lb/ft³ and costs $15 per cubic yard. The calculator would perform the following calculations: $$Volume = Area \times Depth = 100 ft^2 \times 3\,in = 25\,ft^3$$

    Live Chat
  • how to calculate quantities of cement, sand and aggregate

    how to calculate quantities of cement, sand and aggregate

    The dry volume of concrete mixture is always greater than the wet volume. The ratio of dry volume to the wet volume of concrete is 1.54. So 1.54 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete Volume of Cement required = 1/ (1+2+4) X 1.54 = 1/7 X 1.54 = 0.22 Cum

    Live Chat
  • sand calculator - how much sand do you need in tons

    sand calculator - how much sand do you need in tons

    The calculation process is as follows: Estimate the volume of sand needed, using geometrical formulas and plans or measurements. The approximate density of sand is 1600 kg/m 3 (100 lb/ft 3). Multiply the volume by the density (in the same units) to get the weight

    Live Chat
  • calculate sand & gravel per 50kg cement bag in volume

    calculate sand & gravel per 50kg cement bag in volume

    1. 250 kg. The ratio of fine aggregate to coarse aggregate to be used in concrete is 1:2, which means that for every 1 part of sand we have to take 2 part of gravel. Hence we have to divide the Total Aggregate into 3 parts and take 1 part as sand and 2 parts as coarse aggregate

    Live Chat
  • gravel calculator - estimate landscaping material in yards

    gravel calculator - estimate landscaping material in yards

    Step One: Calculate Volume in Yards The first step to estimating gravel, sand, or soil is to estimate the volume of material needed. Start by measuring the length, width, and depth of the area you need to fill in the same unit of measurement. Multiply the length, width, and height together to …

    Live Chat
  • how much cement, gravel and sand do i need? | goodhome ids

    how much cement, gravel and sand do i need? | goodhome ids

    Jan 20, 2021 · One of the main reasons for the presence of sand and gravel is to save on the cost of building materials. Cement is much more expensive than sand or gravel. For this reason, the amount of sand and gravel or aggregates in the concrete is maintained at around 60 to 80 percent of the total volume. However, the quantities used to affect the product

    Live Chat
  • calculate cement sand & aggregate - m20, m15,m10, m5

    calculate cement sand & aggregate - m20, m15,m10, m5

    Understanding Concrete Grades . Based on strength, concrete is classified into different grades like M5, M7.5, M10, M15, M20 etc. In concrete grades, the letter “M” stands for “Mix” and the following number stands for characteristic compressive strength of concrete in 28 days in the Direct Compression test

    Live Chat
  • how to calculatecement,sand& aggregates quantity in

    how to calculatecement,sand& aggregates quantity in

    Aug 03, 2018 · Dry Volume of Concrete = 1 x 1.54 = 1.54 m3 (For Dry Volume Multiply By 1.54) Now we start calculation for find Cement, Sand and Aggregate quality in 1 cubic meter concrete CALCULATION FOR CEMENT QUANTITY Cement= (1/5.5) x 1.54 = 0.28 m3 ∴ 1 is a part of cement, 5.5 is sum of ratio

    Live Chat
  • gravel calculator| how muchgraveldo you need?

    gravel calculator| how muchgraveldo you need?

    Aug 19, 2019 · To calculate the number of tiles you need to buy before getting to work we recommend you to visit our tile calculator. In the middle of grass yard, you want to dig a pool and surround it with a path made of landscape gravel to dry your feet with after a bath

    Live Chat
  • howmuch cement, gravelandsanddo i need? | goodhome ids

    howmuch cement, gravelandsanddo i need? | goodhome ids

    Jan 20, 2021 · Ingredient ratios sometimes vary from taking advantage of this fact. A mixture of a very rigid concrete would use 1 part of cement, 3 parts of sand and 4 parts of gravel. A recipe for a more practical lot would be 1 part of cement, 2 parts of sand and 2 ¼ parts of gravel

    Live Chat
  • gravel calculator - estimate landscaping material inyards

    gravel calculator - estimate landscaping material inyards

    Step One: Calculate Volume in Yards. The first step to estimating gravel, sand, or soil is to estimate the volume of material needed. Start by measuring the length, width, and depth of the area you need to fill in the same unit of measurement. Multiply the length, width, and height together to …

    Live Chat
  • how to calculatequantities of cement,sandand aggregate

    how to calculatequantities of cement,sandand aggregate

    The ratio of dry volume to the wet volume of concrete is 1.54. So 1.54 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete. Volume of Cement required = 1/ (1+2+4) X 1.54 = 1/7 X 1.54 = 0.22 Cum. Volume of Sand required = 2/7 X 1.54 = 0.44 Cum or 15.53 cft

    Live Chat
  • gravel calculator[how muchgraveldo i need

    gravel calculator[how muchgraveldo i need

    You want to be as accurate as possible without over or underestimating the amount of gravel you will need. That’s why we built our online gravel calculator. Keep reading to see just how easy it is to use, what it calculates and how it does it. Our gravel calculator will make you more efficient and can even save you some money! But first…

    Live Chat
  • concrete calculator- how muchconcretedo i need? - the

    concrete calculator- how muchconcretedo i need? - the

    Apr 23, 2018 · 100 x .33 = 33 cubic feet. 33 x .037 = 1.22 cubic yards. Essentially you are solving for volume and then converting to cubic yards. For concrete, the formula for volume is as follows: length x width x thickness. To determine how many bags of concrete you will need, divide the total cubic yards needed by the yield

    Live Chat
  • actual concrete mix ratios for 3000, 3500, 4000, and 4500

    actual concrete mix ratios for 3000, 3500, 4000, and 4500

    If I break the weights down per cubic yard of concrete, it comes to: 1. 702.5 pounds of cement. 2. 1587 pounds of stone. 3. 1217 pounds of sand. NOTE: This load of concrete only had 3/8" stone (aggregate) in it. Some of the other ones had 3/4" or a mixture of both 3/4" and 3/8". This would be considered a 7.5 bag mix of concrete

    Live Chat
  • metriccalculatorforconcrete- cement,sand,graveletc

    metriccalculatorforconcrete- cement,sand,graveletc

    Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. Paving mix - 1:3½ cement:all-in ballast or 1:1½:2½ cement:sharp sand:gravel

    Live Chat
  • cement concrete calculator| pcccalculator| rcc

    cement concrete calculator| pcccalculator| rcc

    Calculate cement concrete mix design or estimate how much cement concrete volume is required for your construction using our free online calculator. Know exactly how many bags, kg and ton of cement, sand and aggregate is needed of specific cement, sand and aggregate ratio (m20, m15, m10, m7.5)

    Live Chat

Get in touch

High-tech zone, Zhengzhou, China

E-mail:[email protected]

logo